Thursday and Friday were a big days. While I was still in Logan for a conference, my of many of my neighbors gathered on Thursday to watch the crane lift the large attic trusses to the east and west ends of the addition. On Friday, the east and west end walls were framed for windows, the subfloor sheathing put down and the new electric panel installed on the back of the new garage.
The original southern exterior wall is still in place but the new support beams are going in for the loft area that will look down on the expanded kitchen area. You'll notice that it will be about 3 feet narrower that the existing ceiling. This is aligns with where the staircase meets the 2nd floor, which if you use your imagination you call see will be an L shape going up the south and west walls of the dining area.


Near the beginning of the of the remodel we learned the floor plan was off by about a foot. We forgot about it after the foundation was poured, but it's turned up in the truss layout. The dormer windows over the garage were supposed to be centered over the door opening. Right now they are off-you guessed it- a foot. It was the first thing I noticed as I was walking towards the house Friday morning. The floor was already stick framed and the sheathing glued down. The plan is for this glitch to be fixed next week when the crane comes, which will hopefully be powerful enough to shift the entire assembly to the west.